Skip to product information
1 of 9

BRITEWAVE

Indoor Plant Shelf Featuring Grow Lamp, 60.24" High 7-Tier Exhibition Unit, S-Curve Corner Design for Floral and Foliage Showcase in Living Area, Patio, Balcony Décor

Indoor Plant Shelf Featuring Grow Lamp, 60.24" High 7-Tier Exhibition Unit, S-Curve Corner Design for Floral and Foliage Showcase in Living Area, Patio, Balcony Décor

Regular price $111.99 USD
Regular price Sale price $111.99 USD
Sale Sold out
Shipping calculated at checkout.
Quantity

About This

  • Science-Backed Growth Perfected: Enhance indoor gardening with 5 head grow lights featuring red, blue, yellow spectrum, 10 dimming levels, auto on/off timer, and adjustable brightness. Tailor light perfectly for every growth stage—eliminate moving plants to chase sunlight.
  • Maximize Space: 7-Tier, 60.24" Tall Plant Stand: Accommodate 20+ plants across 7 tiers! Fits various pot sizes and shapes, keeping your herbs, succulents, pothos & more organized with minimal footprint.
  • Instant Interior Elevation & Perfect Gift: Elevate home décor with the sleek "S" curve design. Blends seamlessly into any living room, bedroom, balcony, or patio corner. A stunning decorative accent & ideal gift for plant lovers.
  • Durability & Safety: Built with 22mm thick industrial iron pipes, heat-cured anti-rust coating, and moisture-proof particle boards (prevents warping/swelling). Anti-tip system + leveling feet ensure unwavering safety and fortified stability for years.
  • Effortless Tool-Free Assembly: Hassle-free setup! Intuitive tool-free process with pre-drilled, numbered parts and a comprehensive visual guide. Transform components into your curated botanical display within minutes.

Overview

  • Color : brown
  • Material : Iron, chipboard
  • Brand : BRITEWAVE
  • Item dimensions L x W x H : 61.41 x 23.62 x 11.02 inches
  • Shape : S-Shape
View full details

Quality You Can Trust

Our goal is simple: CasaOMM, your curated high-quality furniture shop.

  • Modern Side Table

    ⭐️⭐️⭐️⭐️⭐️
    “I ordered the Modern Oak Sofa Side Table through this store, and it arrived in perfect condition. The table looks exactly like the photos, and assembly was straightforward with the included instructions. I was a bit worried about dropshipping, but the quality exceeded my expectations!” – Emily, 42

  • Contemporary Living Room Coffee Table

    ⭐️⭐️⭐️⭐️⭐️
    “I recently bought the Contemporary Living Room Coffee Table as a dropshipping order, and I’m pleasantly surprised by the quality. The table arrived well-packaged, sturdy, and exactly as pictured. It fits perfectly in my living room and feels like a premium product, even though it was shipped directly from the supplier.” – Karen, 46

  • Minimalist Sofa Side Table

    ⭐️⭐️⭐️⭐️⭐️
    “I was a bit worried that the Minimalist Sofa Side Table might look different from the photos or that the quality wouldn’t be great since it’s a dropshipping item. But all my concerns were unnecessary! The table arrived exactly as pictured, feels sturdy, and looks even better in my living room than I expected.” – Sophia, 41

Frequently Asked Questions

Most furniture orders are processed within 2–3 business days. Standard delivery usually takes 7–14 business days depending on your location and the size of the item. For larger items or custom orders, delivery may take a little longer. You will receive a tracking number once your order has shipped.

Yes. We carefully select reliable suppliers and only list furniture that meets our quality and safety standards. Each product description includes materials, dimensions, and care instructions so you can shop with confidence.

We accept returns within 14 days of delivery for unused and undamaged items in their original packaging. Please note that return shipping fees may apply for large furniture pieces. If your order arrives damaged or defective, contact us immediately, and we will arrange a replacement or full refund at no extra cost.

Fast Shipping

Order today, receive tomorrow

Price-match guarantee

Safe money when ordering with us

Hassle-free exchange

Receive a slip for exchanges

5.0 Google Reviews

Customer satisfaction #1 priority